Bentonville West High School

Client:

Hight-Jackson Associates, P.A.

Halff delivered site preparation plans for a 90-acre site that would contain the development of a 370,000 sf facility and subsequent additions. Situated on the west side of Gamble Road, the work consisted of large-scale site development design, including an extension of public water and sewer mains on site to serve the facility, and a private drive from Seba Road to the school property. Bidding and construction phase-services were providing along with design services.
Additionally, record drawings were prepared, including as-built surveys of the completed water and sewer improvements and detention facility.

Locker Room Building Addition — Improvements to this area included site design, bidding and construction phase services, and preparation of record drawings.

Stadium Parking, Ticket Booth and Building Additions — Halff provided topographic survey, site design, site grading and construction phase services.

Halff Services
Involved

  • Construction Services
  • Land Development
  • Surveying