Hight-Jackson Associates, P.A.
Halff delivered site preparation plans for a 90-acre site that would contain the development of a 370,000 sf facility and subsequent additions. Situated on the west side of Gamble Road, the work consisted of large-scale site development design, including an extension of public water and sewer mains on site to serve the facility, and a private drive from Seba Road to the school property. Bidding and construction phase-services were providing along with design services.
Additionally, record drawings were prepared, including as-built surveys of the completed water and sewer improvements and detention facility.
Locker Room Building Addition — Improvements to this area included site design, bidding and construction phase services, and preparation of record drawings.
Stadium Parking, Ticket Booth and Building Additions — Halff provided topographic survey, site design, site grading and construction phase services.
Halff Services
Involved
- Construction Services
- Land Development
- Surveying
Let’s Connect
Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.