SIZE:
72-inch pipe
Client:
North Texas Municipal Water District
Halff led a team of seven specialty subconsultants for the purpose of assisting NTMWD in determining the most likely cause or causes of failure of a 72-inch prestressed concrete cylinder pipe.
The team’s services included pipe sampling and metallurgical and concrete analysis, internal pipeline inspection, geotechnical and corrosion potential analysis, SCADA review and hydraulic transient analysis, and pipe structural modeling. The forensic investigation culminated in a summary report of the team’s findings to NTMWD staff and the NTMWD Board of Directors.
Halff Services
Involved
- Energy
- Surveying
- Water Conveyance & Pumps
- Water/Wastewater Treatment
Let’s Connect
Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.