Weslaco U.S. Border Patrol Station

Weslaco U.S. Border Patrol Station exterior during the day
SIZE:

46,000 sf

Client:

Negrete & Kolar Architects

Halff provided civil and MEP engineering services for the renovation of an existing distribution center into a border patrol station.

The administration/detention building is 46,000 sf with an existing vehicle maintenance building on site. A new 180-ton central plant serves the facility and includes two chillers, primary/secondary pumps and pipe. HVAC systems also include smoke purge and detention grade equipment. Plumbing systems include standard sewer, water and vent. Electrical design includes lighting, power distribution, data and a 100 percent emergency backup system.

Side view of Weslaco U.S. Border Patrol Station
Side view of Weslaco U.S. Border Patrol Station

Halff Services
Involved

  • Federal
  • MEP Engineering

Let’s Connect

Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.

Contact Us